What preparations do we need to build a park?
The preliminary preparation work for building a park is a complex and meticulous process, which involves multiple links and the collaboration of multiple departments. The following are the main contents of the preliminary preparation work:
1. Project establishment and approval
Project establishment:
Based on the needs of urban planning and environmental beautification, an application for park project establishment is submitted.
Write a project proposal or feasibility study report, conduct a comprehensive study on the project's geographical location, market demand, environmental impact, etc., and determine the feasibility of the project.
Approval process:
Submit a project establishment application to the relevant government departments, including necessary documents such as project proposals and feasibility study reports.
After review and approval by government departments, ensure that the project construction complies with relevant laws, regulations and policy requirements, and complies with national and local planning.
2. Planning and design
Design plan:
Commission a professional design agency to carry out the overall design of the park based on the nature, functional requirements and urban planning requirements of the park.
The design content includes the layout, functional zoning, landscape design, architectural design and other aspects of the park.
Drawing review:
Comprehensively review the construction drawings to ensure the accuracy and rationality of the drawings.
The drawings should include necessary contents such as topographic map, current situation map, zoning map, overall design plan map, topographic design map, road overall design map, planting design map, etc.
3. Land acquisition and financing
Land acquisition:
According to the project requirements, apply to the government for land acquisition to ensure that there is enough land for the park construction.
Follow relevant laws, regulations and policies to carry out land acquisition procedures, including consultation with land owners and signing of land acquisition agreements.
Funding and investment:
Develop a financing plan, including various financing methods such as government grants, bank loans, and social donations.
Conduct financing negotiations with financial institutions and negotiate cooperation with investors to ensure that the project has sufficient financial support.
4. Construction preparation
Construction materials and equipment:
According to the construction organization design, purchase the required construction materials, equipment, etc. to ensure that the quality and quantity meet the construction requirements.
Inspect and accept the purchased materials and equipment to ensure that they meet national standards and design requirements.
Construction team and training:
Organize the construction team and clarify the responsibilities of personnel in each position.
Provide professional training and safety education for construction personnel to improve their construction skills and safety awareness.
Construction site preparation:
Complete the construction site leveling, drainage, power supply, water supply and other infrastructure work.
Build temporary facilities, such as construction offices, warehouses, dormitories, etc.
V. Other preparations
Handle relevant procedures:
Apply to relevant departments for construction permits, environmental impact assessments, safety assessments and other procedures.
Ensure that the project construction is legal and compliant, and meets environmental protection and safety requirements.
Coordination and communication:
Communicate and coordinate with relevant construction units such as design units, construction units, and supervision units to clarify the issues and key nodes that need to be paid attention to during the construction process.
Ensure that the work between various departments and various types of work can proceed smoothly.
Formulate management systems:
Formulate various management systems in the process of park construction, such as safety production management systems, quality management systems, etc.
Ensure that the project can proceed in an orderly manner according to plan, while ensuring construction quality and safety.
In summary, the preliminary preparations for building a park involve multiple links and collaboration between multiple departments. Only by doing these preliminary preparations well can we ensure the smooth progress of park construction and the successful implementation of the project.